The coronavirus infectious disease (COVID – 19), which started in late 2019, was found to be caused by the SARS – CoV – 2 virus. The samples collected were from three age categories – below 18, 18 – 49 years and 50 and above. The Delhi government is likely to conduct another sero survey from […]
Community Department: Engineering
Paradise Creek Improvement Project
The goal of this project is to improve the storm water infrastructure, pedestrian safety and connectivity, and the naturalization of Paradise Creek in the areas of National City surrounding Kimball Elementary School. Due to dated infrastructure, the area of interest is subjected to extreme flooding as the result of: a) heavy rain which exceeds the […]
CORONA VIROUS (COVID – 19) ANTIDOTE AND ROLE OF NANOTECHNOLOGY WITH POLLUTION IN ENVIRONMENT.
Background: The coronavirus infectious disease (COVID – 19), which started in late 2019, was found to be caused by the SARS – CoV – 2 virus. The samples collected were from three age categories – below 18, 18 – 49 years and 50 and above. The Delhi government is likely to conduct another sero survey […]
Paradise Creek Improvement Project
The goal of this project is to improve the storm water infrastructure, pedestrian safety and connectivity, and the naturalization of Paradise Creek in the areas of National City surrounding Kimball Elementary School. Due to dated infrastructure, the area of interest is subjected to extreme flooding as the result of: a) heavy rain which exceeds the […]