Site Design Of Musser Lane Recycling Facility

Two teams of BE 460 students will work on projects for the Bellefonte Borough Composting Facility. One team will design a composting process that will result in a sellable product that can be purchased by residents. The second team will design the site layout of the composting facility by considering several factors and adhering to […]

Read More… from Site Design Of Musser Lane Recycling Facility

Big Spring Water Bottling Feasibility: Bellefonte

Big Spring in the Borough of Bellefonte produces 15 million gallons of water per day. There is a 1 million gallon per day surplus of water which the Borough of Bellefonte would like to bottle to sell to the surrounding area. Students are to design and determine feasibility of such an enterprise. Read the final […]

Read More… from Big Spring Water Bottling Feasibility: Bellefonte

Translate »